Project 1812 — placeholder
All projects Multifamily Infill · Calgary

Project 1812

An 8-unit (4+4) wood-frame multifamily infill by Broch Builders — mirroring our 42 Street build, engineered for efficient delivery and long-term rental performance.

Project Type4 + 4
DateMay 2026
Size~7,000 ft²
DesignerJTA

8-Unit Multifamily (4+4) Infill

Project 1812 is a purpose-built multifamily infill development by Broch Builders, mirroring the design, scale, and construction strategy of our 42 Street build. This wood-frame, 8-unit (4+4) project is engineered for efficient delivery and long-term rental performance, totaling approximately 7,000 sq. ft.

The building features 20 bedrooms, 16 bathrooms, and 8 kitchens, providing a balanced unit mix optimized for modern urban living.

20
Bedrooms
16
Bathrooms
8
Kitchens

Architectural design is led by John Trinh & Associates (JTA), with construction scheduled to begin in early Q2 2026. Leveraging standardized systems and disciplined project management, Project 1812 is planned for an estimated 130-day build timeline from construction start through targeted completion.

Build Approach

Project 1812 is executed with Broch Builders’ core principles: speed, coordination, and quality control. The project is structured around tight scheduling, reliable trade sequencing, and hands-on site supervision to ensure design intent translates cleanly into finished product.

By standardizing layouts and construction methods across multiple builds, Broch Builders delivers predictable timelines while maintaining high build quality.

Planning a multifamily build?

Broch Builders delivers scalable rental assets with disciplined timelines and hands-on site management.

Start a conversation